Jeremy Bishop, who describes himself as an ‘Engagement Advisor’, together with his co-worker Katrina Lambert, provided us with a very professional, concise presentation on the huge organisation which quietly ensures that such a nightmare scenario will not happen. In control of some $11 Billion worth of dams, water treatment plants and pipelines, SEQ Water doesn’t just provide drinking and bath water, but also irrigation water to 1200 farmers.
Remember the “Millennium Drought”? It wasn’t pretty. The Hinze Dam (at that time Stage 3 hadn’t been built yet), as well as overall dam levels in South East Queensland went on average to around the 20% mark. Meanwhile, we have a Desalination Plant and Stage 3 of the Hinze Dam, built in 2011, doubled its capacity to over 310,000 Million Litres. Our ‘Water Grid’ boasts some 600 Km of bi-directional water pipeline. Space does not permit to outline Jeremy’s seminar in detail, but on the Download Pages (right side) you will find a PDF of his PowerPoint which is very interesting reading indeed.
(Photo, from left: Chairman of the day, Peter Morgan, Katrina Lambert, SEQ Water, Jeremy Bishop)